Requirments
● The hydraulic system must move up and down at least in no more than 4 seconds per stroke.
● The project must generate at least 10 Watts per stroke.
● The project must generate the power for at least 3 seconds per stroke. ● The Project must Store Energy 50 Amp/H.
● The dimension must be about 600*400*600 mm.
● The project must endure a vehicle of 5000 Ib.
● The project must be easy for maintenance.
● The project should weight no more than 30 Ib.
● The top plate must turn to the first position in no more than 5 seconds.