Requirements:

  • The hydraulic system must be moved up and down at least 6 in.

  • The project must generate at least 10 Watts, per stroke.

  • The project must generate the power for at least 3 seconds, per stroke.

  • The Project must Store Energy 50 Amp/H.

  • The dimension must be about 600*400*600 mm

  • The gears must mesh with other gears to transmit altered torque and rotation.       

  • The gears must support the load of at least 1000 Ib.

  • The gears diameter must start from 2.50 - 3.70

  • The weight of the gears must start from 0.1Ib - 0.32Ib.

The top plate must turn to the first position and not more that 5 seconds    