Requirements:
-
The hydraulic system must be moved up and down at least 6 in.
-
The project must generate at least 10 Watts, per stroke.
-
The project must generate the power for at least 3 seconds, per stroke.
-
The Project must Store Energy 50 Amp/H.
-
The dimension must be about 600*400*600 mm
-
The gears must mesh with other gears to transmit altered torque and rotation.
-
The gears must support the load of at least 1000 Ib.
-
The gears diameter must start from 2.50 - 3.70
-
The weight of the gears must start from 0.1Ib - 0.32Ib.
The top plate must turn to the first position and not more that 5 seconds